Resource detail report
The report shows the details of all loading on the resources.
Field |
Description |
---|---|
Resource |
Resource name. |
Type |
Type of the operation:
|
Operation |
Name of the operation loading the resource.
If the name is ‘setup operation’ this load plan shows a conversion of the
resource to a new setup.
|
Start date |
Date when the load plan starts. |
End date |
Date when the load plan ends. |
Operation quantity |
Quantity of the planned operation. |
Load quantity |
Size of the loadplan. |
Feasible |
Boolean field indicating whether the operation is violating any
material, lead time or capacity constraints.
This is very handy in interpreting unconstrained plans.
|
Criticality |
Indication of the urgency of the operation.
A criticality of 0 indicates that the operation is on the critical
path of one or more demands.
Higher criticality values indicate a delay of the operation will
not immediately impact the delivery of any demand.
A criticality of 999 indicates an operation that isn’t used at all to
meet any demand.
|
Net duration |
Actual duration of the operation, which doesn’t include any unavailable time between the start and end date. |
Inventory Status |
The inventory status of the operation. |
Status |
Status of the operation:
|
Setup |
Setup of the resource during this loading. |
Reference |
Reference of the manufacturing order or distribution order plan loading the resource. |
Related permissions |
---|
Can view resource report |
Can change operationplan |
Can delete operationplan |